5S (sort, straighten, shine, standardize, and sustain) is used to create order and organization.
Answer
True
Card 2
Question
A ____ focuses on the sequence of activities and work required to produce a product or service.
Answer
Value Stream
Card 3
Question
A ______________ transformation is a transformation of non-normal dependent variables into a normal shape.
A Belt gathered the following defect data for a process and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data:
Step 1 = 38
Step 2 = 17
Step 3 = 56
Step 4 = 42
Answer
Box cox
Card 4
Question
A 1-sample t-test is used when you want to compare the Median of one distribution to a target value?
Answer
False
Card 5
Question
A belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
Answer
Never, a Control Plan is a living document
Card 6
Question
A Belt experienced an Alpha of .05 and a Beta of .10 and knew these are the most common risk levels when running a Statistical Test.
Answer
True
Card 7
Question
A Belt gathered the following defect data for a process and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data:
Step 1 = 38
Step 2 = 17
Step 3 = 56
Step 4 = 42
Answer
Steps 3, 4, 1, then 2
Card 8
Question
A Black Belt is a project team leader, working full time to solve problems under the direction of a Champion and with technical support from the Master Black Belt. Black Belts work on projects that are relatively complex and usually have a high financial return for the company.
Answer
True
Card 9
Question
A box-and-whisker plot of yearly salaries for car salespersons has a Q1 of $50,000, Q2 of $57,000, and a Q3 of $70,000. Which of the following salaries would be considered outliers for the set?
I. $28,000
II. $35,000
III. $70,000
IV. $105,000
Answer
I and IV
Card 10
Question
A capacity constrained resource (CCR) is different from a bottleneck because a CCR
Answer
can affect processes even if the operations are not running at full capacity.
Card 11
Question
A company wishes to reduce muda in their manufacturing process by achieving single-piece-flow. How should their cycle time be modified?
Answer
The cycle time of all operations in a complete process should be equal to the takt time.
Card 12
Question
A Control Chart can tell us a lot about a process. What is the best example of a process shift type of cause?
Answer
9 points in a row on the same side of the centerline
Card 13
Question
A non-parametric test makes assumptions that the data are from normal populations:
Answer
False
Card 14
Question
A plan to improve quality is carried out during which step of the Plan-Do-Check-Act (PDCA) cycle?
Answer
Do
Card 15
Question
A population is a collection of all the individuals of interest and the population has its own statistics:
Answer
True
Card 16
Question
A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a _____ result.
Answer
Customer desired
Card 17
Question
A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a customer desired result.
Answer
True
Card 18
Question
A study is being performed on the effects of video games on boys and girls. The x-axis on the chart represents time and the y-axis represents hyperactivity. Points are plotted along a line for boys and a separate line is plotted for girls. Which data plot in the following exhibit represents no interaction? (image)
Answer
A
Card 19
Question
A Type I error is when we:
Answer
Reject the Null Hypothesis when it is actually true
Card 20
Question
A type of error that exist in statistics is?
Answer
Bias in sampling