Material produced by one process is used in the same order by the next process. A FIFO queue is filled by the supplying process and emptied by the customer process.
Card 182
Question
What is flow?
Answer
The progressive achievement of tasks along the value stream so a product proceeds from design to launch, order to delivery and raw to finished materials in the hands of the customer with no stoppages, scrap or backflows.
Card 183
Question
What is information flow?
Answer
The task of disseminating information for taking a specific product from order entry through detailed scheduling to delivery.
Card 184
Question
What is internal setup?
Answer
Die setup procedures that must be performed while a machine is stopped also known as inner exchange of die.
Card 185
Question
What is inventory?
Answer
The money invested in purchasing things an organization intends to sell.
Card 186
Question
What is just-in-time (JIT) manufacturing?
Answer
An optimal material requirement planning system for a manufacturing process in which there is little or no manufacturing material inventory on hand at the manufacturing site and little or no incoming inspection.
Card 187
Question
What is kaizen?
Answer
A Japanese term meaning gradual unending improvement by doing little things better and setting and achieving increasingly higher standards.
Card 188
Question
What is lead time?
Answer
The total time a customer must wait to receive a product after placing an order.
Card 189
Question
What is lean manufacturing/production?
Answer
An initiative focused on eliminating all waste in manufacturing processes. Principles include zero waiting, zero inventory, pull scheduling, small batch sizes, line balancing and shorter process times.
Card 190
Question
What is lean?
Answer
Producing the maximum sellable products or services at the lowest operational cost while optimizing inventory levels.
Card 191
Question
What is level loading?
Answer
A technique for balancing production throughput over time.
Card 192
Question
What is material handling?
Answer
Methods, equipment and systems for moving materials between processes and transferring finished parts.
Card 193
Question
What is muda?
Answer
The Japanese word for waste, any activity that consumes resources but creates no value.
Card 194
Question
What is one-piece flow?
Answer
Each product goes through each process step one at a time, without interruption.
Card 195
Question
What is one-touch exchange of dies?
Answer
Reducing die setup changeover to a single step.
Card 196
Question
What is overall equipment effectiveness (OEE)?
Answer
The product of a machine's availability, performance efficiency and first pass yield.
Card 197
Question
What is overprocessing?
Answer
Poor tool and product design resulting in waste, one of the eight wastes.
Card 198
Question
What is overproduction?
Answer
Producing ahead of demand, one of the eight wastes.
Card 199
Question
What is PDCA (plan-do-check-act)?
Answer
A four-step management method for continuous improvement.
Card 200
Question
What is point of use storage?
Answer
Storing items where they will be used.