Anything that limits a system from achieving higher performance or throughput also, the bottleneck that most severely limits the organization’s ability to achieve higher performance relative to its purpose/goal.
Card 162
Question
What is a fishbone diagram used for?
Answer
To map out all potential causes of a problem.
Card 163
Question
What is a functional layout?
Answer
The practice of grouping machines or activities by type of operation performed.
Card 164
Question
What is a histogram used for?
Answer
Shows distribution and shape characteristics of process data.
Card 165
Question
What is a Pareto chart used for?
Answer
To identify the vital few sources causing most defects.
Card 166
Question
What is a Pareto chart?
Answer
A graph showing frequency of problems from most to least occurring.
Card 167
Question
What is a process considered if a control chart has special cause variation?
Answer
Out of control.
Card 168
Question
What is a pull system?
Answer
A system where downstream processes withdraw items from upstream supermarkets.
Card 169
Question
What is a scatter diagram used for?
Answer
To assess correlation between an input and output variable.
Card 170
Question
What is a stakeholder analysis?
Answer
The process of identifying project stakeholders and determining their needs/interests.
Card 171
Question
What is a stakeholder?
Answer
Any person or group impacted by the project.
Card 172
Question
What is a value stream?
Answer
All activities required to provide a product or service to the customer.
Card 173
Question
What is activity based costing?
Answer
An accounting system that assigns costs to a product based on the amount of resources used to design, order or make it.
Card 174
Question
What is cellular manufacturing?
Answer
Arranging machines in the correct process sequence, with operators remaining within the cell and materials presented to them from outside.
Card 175
Question
What is changeover time?
Answer
The time required to modify a system or workstation, usually including both teardown time for the existing condition and setup time for the new condition.
Card 176
Question
What is cycle time?
Answer
The time required to complete one cycle of an operation. If cycle time for every operation in a complete process can be reduced to equal takt time, products can be made in single-piece flow.
Card 177
Question
What is downtime?
Answer
Lost production time during which a piece of equipment is not operating correctly due to breakdown, maintenance, power failures or similar events.
Card 178
Question
What is equipment availability?
Answer
Machine operational availability is the percentage of time during which a process (or equipment) is available to run.
Card 179
Question
What is error detection?
Answer
A hybrid form of error proofing. It means a bad part can be made but will be caught immediately, and corrective action will be taken to prevent another bad part from being produced.
Card 180
Question
What is essential to best accomplish a six sigma design?
Answer
Y = f(x)