Devices to communicate production status at a glance.
Card 143
Question
What causes of variation are present on a control chart for a process that is in control?
Answer
Common cause variation.
Card 144
Question
What do control limits represent?
Answer
The thresholds for common cause vs special cause variation.
Card 145
Question
What does a control chart consist of?
Answer
Center line, upper and lower control limits, and data points plotted over time.
Card 146
Question
What does a histogram show?
Answer
The distribution and shape of data related to a metric.
Card 147
Question
What does ANOVA analysis do?
Answer
Compares means of multiple groups to see if there is a statistically significant difference.
Card 148
Question
What does correlation analysis measure?
Answer
The strength of relationship between two variables.
Card 149
Question
What does CTQ stand for?
Answer
Critical to Quality.
Card 150
Question
What does DMAIC stand for?
Answer
Define, Measure, Analyze, Improve, Control.
Card 151
Question
What does DOE stand for and what is it used for?
Answer
Design of Experiments - test potential solutions to determine effectiveness.
Card 152
Question
What does FMEA stand for and what is it?
Answer
Failure Mode and Effects Analysis - assess risk priority of process failures.
Card 153
Question
What does TAKT time measure?
Answer
The pace of customer demand.
Card 154
Question
What does TPM stand for?
Answer
Total Productive Maintenance.
Card 155
Question
What factors should be considered when defining the problem in DMAIC?
Answer
Impact on customer, impact on business, scope, and resources required.
Card 156
Question
What is a affinity diagram?
Answer
A tool to organize ideas into groups based on natural relationships.
Card 157
Question
What is a bottleneck?
Answer
Any resource whose capacity is equal to or less than the demand placed on it.
Card 158
Question
What is a box plot used for?
Answer
To visualize distribution, outliers, and quartiles in data.
Card 159
Question
What is a breakthrough event?
Answer
A dramatic change in process during which a team gets past an old barrier or milestone to achieve a significant increase in efficiency, quality or some other measure.
Card 160
Question
What is a cell?
Answer
An arrangement of people, machines, materials and equipment in which the processing steps are placed right next to each other in sequential order and through which parts are processed in a continuous flow.