No redundancy. Minimum toes necessary. Think having 5 toes per foot.
Card 222
Question
Define the following power redundancies: N+1
Answer
What is necessary plus one extra. 5 toes plus an extra toe.
Card 223
Question
Define the following power redundancies: N+C
Answer
What is necessary plus a catcher (zone defense).
Card 224
Question
Define the following terms: ATSC
Answer
Automatic Transfer Switch Cabinet.
Card 225
Question
Define the following terms: HOST
Answer
A server inside a rack.
Card 226
Question
Define the following terms: PDU
Answer
Power Distribution Unit.
Card 227
Question
Define the following terms: rPDU
Answer
Rack Power Distribution Unit.
Card 228
Question
Define the following terms: SLA
Answer
Service Level Agreement.
Card 229
Question
Define the following terms: TOR
Answer
Top of Rack Switch. Responsible for transmitting all data for it's associated hosts out of the rack, to the end user. Racks can have between 1 and 4 TORs.
Card 230
Question
Describe how the ATSPSU will respond with a BBU.
Answer
If primary power is lost, rack will transition to the BBU until BBU reaches low capacity. Rack will then transition to catcher.
Card 231
Question
Describe how the ATSPSU will respond to a loss of power without a BBU.
Answer
If primary power is lost, rack will transition directly to catcher. Alarm will generate due to removed battery.
Card 232
Question
Describe the major power shelf components within a Who Made Who (WMW) rack
Answer
Rectifier, ATS, and BBUs.
Card 233
Question
Describe the operation of an ATS in the following situations including any transition times or time delays: Catcher is lost
Answer
Nothing will happen. The ATS will stay on Source 1 output without redundancy
Card 234
Question
Describe the operation of an ATS in the following situations including any transition times or time delays: Primary power is lost
Answer
Non-WMW: ATS will transfer to source 2.
WMW: Battery will supply load until drained, then load will transfer to source 2.
Card 235
Question
Describe the operation of an ATS in the following situations including any transition times or time delays: Primary power is restored
Answer
ATS will transfer back to source one after the source stabilization timer elapses.
5 min.
Card 236
Question
Describe the purpose of a flip test
Answer
Confidence Test of Equipment’s ability to transfer between redundant sources without dropping the rack. Done on any rack with Gallery Based Electrical Redundancy on all redundant schemes. (ie, if C2N, Swing Load Confidence Test and ATS Flip Test)
Card 237
Question
Discuss how you would respond to a rack with elevated inlet temperatures.
Answer
Inspect temperature probe locations to determine if they have been relocated. Verify associated air handlers are operating properly. Deploy temporary cooling units where needed.
Card 238
Question
Discuss the actions required if a rack is landed without the required power topology (e.g. a 20 Kva rack in a 10 Kva spot)
Answer
Escalate to land the rack where required power topology can be provided.
Card 239
Question
Discuss the WMW rack power supply unit's rated input voltage.
Answer
480 VAC
Card 240
Question
Explain what the different indicating lights on an ATS mean including fault lights
Answer
Green lights for source availability (1 or 2), which source is aligned (1 or 2), and if the output is functional. A red light indicates faults.