Card 321

Question

Name the different ways you can start the generator from the switchgear?

Answer

AMCOP HMI generator confidence test, AMCOP mode switch to manual and generator start switch.

Card 322

Question

Under what circumstances would we need to do a PDP tie? Is it an Open/Closed Transition?

Answer

Anything that involves power loss downstream of the CDB will require a PDP to supply power to the critical load. CLOSED transition.

Card 323

Question

What are some typical size breakers within the facility?

Answer

4000, 3000, 1600, 800, 600, and 30 Amps

Card 324

Question

What are the 2 sources of 120VAC control power to the AMCOP?

Answer

Associated HPP, HUPP/CUPP.

Card 325

Question

What are the AMCOP timer settings?

Answer

Utility Source Loss - 3 sec

Utility Source Stabilization - 9 min 30 sec

Out of Tolerance Event Delay - 55 sec

3 Strike Return Timer - 2 seconds

UPS on Battery - 50 sec

UPS on Battery Event Timer - 180 sec

Utility CB Failure to Open/Close - 3 sec

Dead Bus Timer - 90 sec

UPS Return to Utility Timer - 120 sec

Gen Source Loss Timer - 10 seconds

Gen Source Stabilization Timer - 5 sec

Gen Exercise Timer - 6 min

Gen Cooldown Timer - 5 minutes

Gen Crank Failure - 52 sec

Gen CB Failure to Open/Close - 3 sec

Open Transition Transfer - 2 sec

Card 326

Question

What are the control power sources to the BACOP?

Answer

Associated HPP, HUPP/CUPP.

Card 327

Question

What are the different automatic transfer times for the following transitions: Mechanical ATS primary-to-catcher

Answer

ATC300=48 Seconds to emergency and 5 Minutes back to source 1.

Card 328

Question

What are the different automatic transfer times for the following transitions: Primary source stabilization

Answer

6 minutes for the first lineup. 30 seconds for each additional lineup, sequentially.

Card 329

Question

What are the different automatic transfer times for the following transitions: USB CDB-to-Catcher

Answer

ATC-600= 2 minutes to emergency 5 Minutes from Emergency to Source 1

Card 330

Question

What are the different automatic transfer times for the following transitions: Utility-to-Generator

Answer

Source Loss: 3 seconds Generator Stabilization: 12 seconds (5 seconds at WMW)

Card 331

Question

What are the time delays associated with a power outage and in what order do they occur? What happens at the end of each time delay?

Answer

3 Seconds: Utility Breaker Open/Start Signal to Gen sent. 12 Seconds AFTER stable power is seen from Gen Basler, Closure of Gen Breaker.

Card 332

Question

What are the time delays associated with Utility Power Returning?

Answer

6 minutes for the first lineup. 30 seconds for each additional lineup, sequentially.

Card 333

Question

What conditions need to be met to receive the “Ready to parallel” light on PDP

Answer

Upstream UPSs are in Maintenance Bypass (AC phase is in sync for closed transition)

Card 334

Question

What equipment does the Critical Lighting Panel (CLP) serve?

Answer

Emergency lighting for EH, MH, and DH.

Card 335

Question

What equipment does the Critical Power Panel (CPP) serve?

Answer

Temp. Gen shore power, roof receptacles, DAHU receptacles, BMS

Card 336

Question

What equipment does the Critical Uninterruptible Power Panel (CUPP) serve?

Answer

Controls: USB, UPS, generator, BACOP, and COP.

Card 337

Question

What equipment does the House Lighting Panel (HLP) serve?

Answer

Associated ER, MH, and DH Lighting

Card 338

Question

What equipment does the House Power Panel (HPP) serve?

Answer

Associated ER, roof, MH, and DH outlets. Roof lighting. BACOP, MV Switchgear, and AMCOP control power. EPMS enclosure.

Card 339

Question

What equipment does the House Service Distribution Board (HSDB) serve?

Answer

ER Exhaust Fans

ER Air Handlers

DH Exhaust Fans

DH Air Handlers

Generator

ICW Pumps

HPP Panel

Card 340

Question

What equipment does the House Uninterruptible Power Panel (HUPP) serve?

Answer

Controls: Gen CAM SWBD, UPS, USB, MV Switchgear, PDP, AMCOP, BACOP

Security loads: FACP, VESDA.

ERM: Air Handler Controls, BMS, EPMS.

POD: Air Handler Controls, BMS, EPMS. 

How to use this set

Read the preview and check whether the content and answers suit your learning goal. You can add the public set to your sets to study it. Your account shows the available actions.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.